Sealed from foundation to roof.
Commercial waterproofing and caulking for South Florida’s towers, garages and plazas, with everything your team needs to prequalify us in one place.
Scroll to see how a deck gets sealed, or skip to the systems
- License 21BS00612
- Systems by Tremco, Sika, CETCO, SOPREMA
- Insured & bonded
- Miami-Dade · Broward · Palm Beach
Where we work
Below grade & elevator pits
Foundation walls, mat slabs and elevator pits sit at the water table. Sheet-applied and cementitious systems keep them dry.
- Sheet-applied membranes
- Cementitious
- Below-grade systems
Where we work
Garage & plaza decks
Parking levels and amenity plazas carry cars, planters, pools and rain. Deck and traffic coatings protect the structure under them.
- Vehicular coatings
- Deck coatings
- Hot-applied
Where we work
Facade, balconies & roof
Caulking, expansion joints and air & vapor barriers close every gap between windows, panels and slabs.
- Caulking & sealants
- Air & vapor barriers
- Expansion joints
Step 1 · The problem
It starts with a crack.
Water finds hairline cracks and open joints, reaches the rebar and drips into the garage below.
Step 2 · Surface prep
Prep is half the job.
Shot blasting removes laitance and opens the concrete to the right profile so the system can bond.
- Shot blasting
- Concrete surface profile
Step 3 · Cracks & joints
Every crack, sealed.
Cracks are routed and sealed. Expansion joints get a flexible profile that moves with the building.
- Crack routing
- Joint sealant
- Expansion joint
Step 4 · Primer
Primer locks in the bond.
A penetrating primer seals the pores and prepares the concrete for the membrane.
- Penetrating primer
Step 5 · Membrane
The barrier goes on.
A continuous membrane covers the deck, turns up every curb and wraps around every drain.
- Fluid-applied membrane
- Flashing at curbs & drains
Step 6 · Flood test
Then we flood it.
Water stands on the deck for 24 to 48 hours. Below, the garage stays dry. Only then is it covered.
- 24–48 h flood test
- Dry below
Step 7 · Wear course
Built to take traffic.
Protection course, a wear coat with anti-slip aggregate and fresh striping.
- Protection course
- Traffic coating
- Striping
The result
Water stops here.
Rain beads, runs to the drains, and the garage below stays dry.
Invite us to bid













